do you have countermeasures for this problem?

[复制链接]
发表于 2006-11-8 01:42 | 显示全部楼层

工业管道

<br/>

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册

x
发表于 2006-11-9 06:26 | 显示全部楼层
i have no idea about it
发表于 2006-11-15 03:18 | 显示全部楼层
ri...hai shi ri..
发表于 2006-11-16 04:59 | 显示全部楼层
he should wear fireproof clothes, and clear away any flammable materials in the sparks areas, when conduct such works, he must have some fire extinguishers in work site.
发表于 2006-11-28 04:28 | 显示全部楼层
A hot work permit application process should b conducted before the work performed? Should it b a hot work?[em04]
发表于 2006-11-30 22:49 | 显示全部楼层
<p>read</p>
发表于 2006-12-2 00:51 | 显示全部楼层
<p></p><p>Good there're some safety who like english. </p><p>I will come here frequently.</p>
发表于 2006-12-2 04:05 | 显示全部楼层
hot work permit is necessary actually,but&nbsp;whether we can take some corrective action to rectify. i think we can not stage our work with hazards condition even enough PTW is applied.
发表于 2006-12-2 23:14 | 显示全部楼层
thank you very much
发表于 2006-12-7 01:54 | 显示全部楼层
<p>what hardship you are !&nbsp;&nbsp; you are&nbsp;hardship!</p><p></p>
发表于 2006-12-7 06:15 | 显示全部楼层
英语安全角
发表于 2006-12-13 23:47 | 显示全部楼层
谢谢,让我也顺便练了下英语
发表于 2006-12-19 03:55 | 显示全部楼层
<p>make the cloth wet,</p><p>in my opinion</p>
发表于 2006-12-21 02:40 | 显示全部楼层
VERY GOOD.THANK YOU
发表于 2006-12-23 05:26 | 显示全部楼层
<p>1st, before the job beginning,it's should be permitted;----application should contain some key points just as must prepare fire extinguisher,and some PPE;</p><p>2ed, the worker should comply the SOP,and take out the inflammalbe substance in the work region at least 2 meters.</p><p>3rd, when find the some fire then ask help and take the right action.</p>
发表于 2006-12-26 05:11 | 显示全部楼层
wuwu
发表于 2007-1-1 01:39 | 显示全部楼层

RFC

Fire retardant cloth required or at least welder cloth needed for grinding
发表于 2007-1-6 00:01 | 显示全部楼层
I dont know why the gay put his t shirt behind the sparkle,  do he not understand it will burn?thougt it is very stupid,but the same thing usually happen around us.
发表于 2007-1-6 00:14 | 显示全部楼层
I recommend the FRC is made from Nomex IIIA.
发表于 2007-1-7 12:24 | 显示全部楼层
a hot work permit is necessary. a site inspection should be done before the work beginning to confirm that all the ppe is prepared and the environment is safe too. the company's overseer and the contractor's overseer should be in the site all the time during the hot work time